Other
CPR CS50 Overflow Box (Flow rate 300GPH)
Bought as a complete set when tank was first set up in 2010.
Installed on August 18, 2014
Sump
Megaflow Sump
Bought as a complete set when tank was first set up in 2010.
Installed on August 16, 2014
Powerhead
SCWD
Switching current water director. Bought as a complete set when tank was first set up in 2010.
Installed on August 16, 2014
Powerhead
Hydor Koralia
Installed on August 16, 2014
Pump
Mag-Drive Utility Pump
Bought as a complete set when tank was first set up in 2010.
Installed on August 16, 2014
Heater
ViaAqua Titanium Heater
Installed on August 16, 2014
Other
Current USA PC light
Dual 96 watt PC fixture. Moonlight LEDs. Bought as a complete set when tank was first set up in 2010.
Installed on August 16, 2014